Rooftop electrical containment for the Pilgrims Quarter HMRC development, Newcastle — HV, MV and LV cable management across two roof areas.
The Project
Working as part of the wider Pilgrims Quarter development, Smartlec Systems were appointed to install the rooftop electrical containment infrastructure serving multiple building services across two separate roof areas. The installation needed to accommodate high-voltage, medium-voltage and low-voltage cabling while providing dedicated containment routes for rooftop plant including HVAC equipment, air source heat pumps and lighting installations.